High-density compute infrastructure
Electrical, mechanical and thermal equipment for data centre projects where power density, cooling capacity and schedule all matter.

What matters
Data centre delivery depends on electrical capacity, heat rejection and the availability of long-lead equipment. Wafr supports project teams with selected equipment packages, technical documentation and project-specific configuration.
01
Power capacity
Transformers and switchgear aligned to facility electrical requirements and project architecture.
02
Thermal capacity
Dry, adiabatic and Wafr thermal equipment selected around load and site conditions.
03
Schedule & documentation
Equipment documentation and delivery planning organized around project milestones.
Relevant equipment
Start with the product family, then move into technical specifications, documentation and a project-specific RFQ.

Electrical
Voltage transformation for facility power distribution.
Explore product →

Electrical
Protection, control and distribution for critical electrical infrastructure.
Explore product →

Mechanical
Heat rejection equipment selected around climate and project duty.
Explore product →

Wafr Technology
Proprietary thermal infrastructure for high-density liquid-cooled environments.
Explore product →
Applications
Start with the project basis
A useful RFQ starts with the project conditions that actually determine equipment selection and delivery.
01
Facility load
IT load, operating load and planned expansion.
02
Electrical basis
Incoming voltage, one-line and distribution requirements.
03
Thermal basis
Cooling duty, supply / return temperatures and design conditions.
04
Schedule
Site location, target delivery and commissioning milestones.
Have a one-line, equipment schedule or design basis?