Industries

Commercial Buildings & Campuses

Complex building infrastructure

Critical equipment for complex facilities.

Electrical and thermal infrastructure for campuses, institutional facilities and large buildings with demanding power and cooling requirements.

Industry equipment

What matters

Large facilities are infrastructure projects in their own right.

Campus and building projects often combine electrical upgrades, central cooling infrastructure, staged construction and tight occupancy requirements. Wafr supports selected equipment packages around those technical and schedule constraints.

01

Capacity & resilience

Electrical equipment selected around current loads, redundancy and future expansion.

02

Central thermal systems

Heat rejection and thermal storage aligned to cooling plant requirements.

03

Phased construction

Equipment supply and documentation coordinated around renovation and occupancy schedules.

Relevant equipment

Equipment for the application.

Start with the product family, then move into technical specifications, documentation and a project-specific RFQ.

Applications

Where the equipment gets used.

Institutional campuses, Healthcare facilities, Universities, District energy, Large commercial buildings, Central utility plants

Start with the project basis

What to send Wafr.

A useful RFQ starts with the project conditions that actually determine equipment selection and delivery.

01

Electrical load

Existing and future load, service voltage and redundancy basis.

02

Building drawings

One-line, equipment schedules and available plant space.

03

Thermal requirements

Cooling duty, loop temperatures and peak-load profile.

04

Project phasing

Construction stages, occupancy constraints and required delivery dates.

Have a one-line, equipment schedule or design basis?

Send it with the RFQ and Wafr can start from the project requirements.

Start Project RFQ